Tuesday, June 11, 2013

Kitchen.... Windows...

I went to Ezi-Kit and had and 1 and 1/2 hour designing session... boy was it worth it. They did a great job and gave great advice and I loved the end result. They emailed me a pdf that if viewed through acrobat reader (heads up mac users it doesnt work in Preview) you can span, zoom, rotate, etc... any way sad thing is i cannot upload it to blogger... so if you are interested email me and i can email it to you..

Also today I ordered my doors for the front, the glassier will be coming over on Saturday to measure up... I am aiming for the second week of the holidays to have it all complete. So that is 6 weeks to get the veranda framework up and braced and the gable end removed and studded up.... it is going to be tight. I hope the good weather keeps up.


Seth


The queens birthday weekend. God save the Queen!

Me and the boys after school one day removing some posts from my slab. 

Great day for building!

In the beginning....


Angus was a terrific helper! 








Rory and I took some time out to tackle some sheep for the mobile butcher to do his thing... 
See the shed in the back ground... I had to carry/drag this big sucker there and he wasn't going to be helpful at all! Horn were handy though.
ahhh love the light (ask me again during summer : ) this will be the view from my kitchen looking through the dinning room. 
Top studded up. This was fun due to a wonky and twisted rafter... 
Ahhh it is taking shape.... next the veranda.

Finger update

Sorry it is a bit gross but it is what it is... the finger is healing well...