Sunday, August 7, 2016

Bathroom x2, laundry, hallway and mudroom photos.

In the mad rush of things I didn't take a huge amount of photos. Here are a fare few though.... Im saving the finished photos for later... when it is completely finished!







Laundry
Big bathroom. Love a good bulk head. 
Looking from hallway into mudroom, small bathroom. To the right is the laundry
Small bathroom waterproofed and painted. 
big bathroom shower liner
I was pretty proud of my bracing method. I put a 45 degree notch and shimmed the top and bottom. Worked a treat and was easy 
Ta da!
Small bathroom shower
Favourite thing so far (besides bath) sensor lights in the hallway :) 
Ahhh hallway finally has lights! Could do without those plaster sheets :)
baths in!

Slacker!

Yep I am calling myself out on the lack of updates. I had planned to send a completed image of the work i have been doing but it is going to take longer than I hoped and so we have to settle for the update images instead of the "wow its completed!" ones.

Well a lot has happened. Basically Heather and I got to a point at the beginning of the year that we decided that it had to be finished this year. Enough was enough. So we started a lengthly process of getting finances. Well that was the first big hurdle to overcome. Since the GFC basically everyone has become really really tight. Just the mention of owner builder sent most banks into cold sweats and hiding behind policy. Didn't matter that I had been paying everything beautifully for upteen years. I had capacity up the warzoo to repay it and a massive amount of equity. Nope two words shut all doors. Finally thanks to the help of a resourceful broker and some common sense the Bank of Melbourne came to the rescue. Not only did they give me the loan at a better interest rate and fee structure than my current loan they also paid me cash! All the rest that looked at it wanted receipts and quotes etc. Nightmare stuff for the piddly amount we were borrowing. So a huge thanks to the BOM and Craig and Mortgage choice!

Well next hurdle was to find a good builder willing to do the relative small job. You would be amazed how many turned it down without looking at it, they were too busy. Obviously too much work around... but I get it. This is when a retired builder and friend of the family stepped up and did the job. It is amazing how quickly it all went. They had the last part of the house torn down and up in about two weeks! It would have taken me ages! He did a great job dealing with the wonky wall, crumbing sandstone, crappy floor, etc..... nice to have that experience to draw on. I love watching others work on my house especially when it includes grinding cement! So a big thanks to Robert Holstein and Will Meure. Also a big thanks to Brent Griggs (electrician), Cygnet Glass and Huon Plumbing for coming quickly and promptly. It all ran rather smoothly. I spent the two weeks running around like a git making sure they had everything they needed. My goodness the amount of stuff you need to do two bathrooms and a laundry. You should have seen the guest room piled high with appliances. It even spilling out onto the verandah. Had a massive trailer full of cardboard and styrofoam by the end.

Unfortunately they didn't finish the job. I still needed to paint, plaster, waterproof, tile and fit out.... that is where the term 1 holidays finished. There was an amazing amount of work done. Finally the house was fully and properly clad, plumbing and electricity in, windows, external doors, insulated, etc. It felt SOOOO good! No more room to build, tick that off the list.

So next I had to contact a plaster. I cannot say this loud enough but Knauff sheets are just terrible! Quality control does not exist on those sheets. CSR plaster boards are much better! But what do I care..... I don't have to order any more plasterboards sheets... ever again! (well if I wanted to and the kids stop damaging the ones that are already in!). What a liberating feeling one gets knowing that : ) I would have loved to have done the stopping but there was no time as school had begun. They did a great job. It was neat and nicely done though they loved their mesh tape a bit too much for my liking. My love of arches through them a bit... the boss had to come do it : )

So then my job was to waterproof, paint and install the showers ready for the tiler who was to come the beginning of the term 2 holidays. Bit of a stressful term 2 trying to get it all done correctly and order all the materials but I did it... just : ) I must say I did a pretty good job of the acrylic wall liners... much better than the one upstairs. So term 2 holidays came.... three lovely weeks! Dan DeJong came in to do the tiling. He did a great job. He makes custom guitars as a hobby and it came through in some parts of his tiling. Plumber came and fitted out after the tiler had left and the sparky (thanks Cade) came and did his bit. Again I ran around like a chook getting everything again and being a distraction and a general nuisance probably. Gleaming what I could from them. But the end result was two functioning bathrooms and laundry! Finally! It had been nearly 4 months of having only the one bathroom that was in our ensuite... very awkward with sleeping babies and guests.

So here I am term 3 has begun and I can finally just focus on being a teacher again. We have two functioning bathrooms and a laundry.... but still I am not done. Many finishing touches are still needed to be done to get the certificate of completion: Skirting boards, architraves, bulk head lining, barn door, hallway cupboard doors, laundry cabinetry, ducting, roof insulation, mud room cabinetry..... etc. The list goes on and on and on. They will take a lot of time but nothing too trying or stressful.

Well I have now hit the final stretch of a long race. Legs are sore, body screaming to stop, you know the finish line is close and you catch glimpses of it, you have moments of delirium and only the rhythm of one foot in front of the other keeps you going.... almost there... almost there....




Sunday, April 10, 2016

Walk in Pantry.

Hello everyone. Well, the pantry is finally done!... well almost. I still need the electrician to come in and install the powerpoints and sensor light. I am not 100% sure I got the design right but time will tell. It's a fairly big pantry at 2.1 x 4.2m. 


I made a mess of the first attempt of the self level cement. In my rush to get it finished I poured the cement when it was too hot. The sandstone foundations worked like a heat sink during the day so when I threw it at night the cement set ultra fast. So I then had to grind it back to flat and re throw it after 3 weeks waiting for new stock to come in. Sucked. 
I used a special self level cement that can be used as a wear surface and covered it will an epoxy.  I dont mind the finish though it is slippery when wet. It is so easy and quick to pour I have decided to use it in the remaining parts of the house but will use a produce called Metacreme which gives a matt finish and wont be slippery... but costs $1000 for a bucket!!!! crazy. 



I reused my father in laws old kitchen cabinets in the pantry... they look nice but as always reusing things are more hassle than their worth. Bench also bowed slightly whist drying? We can live with it. 
We planned this room with a bench so we can put our appliances on them. We feel we will use them more, it will be more convenient and will keep our kitchen benches clear. 





I put ply board sheets at the far end of the pantry so I can put screws in anywhere to hang brooms, mops, dust pans, etc as that end of the pantry is where we will be keeping out cleaning stuff. 
hmmm where did this photo come from : ) Looking forward to getting another bike one day!

Thursday, January 21, 2016

Hallway floor

Well I found that I had a little extra time on my hands these holidays so I finally lay the hallway floor! It has been sitting around for a good 6 months. I tried a couple of different things this time. Some worked some didn't. 

1) I used a v notched trowel instead of a notched trowel (square) to lay the adhesive and I found I had more air pockets under the floor. So that didn't work too well. But I felt I had less glue in the joins... so it kinda worked as well.
2)  I tried my hand at drum sanding! I think i did ok. The only problem was that the hallway is narrow and had lots of obstacles so.... dont look too closely at the finish as i kept on bumping into things. But not bad for a first time. I started with an 80 grit paper instead of a 40 grit so any damage wasn't too drastic. It meant I had to go over it an extra time or two but I preferred that than doing major damage.  

3) The last thing I did different was that I used a commercial grade two part polyurethane on the floor.  The product I used was by Toby and is called Aquamax commercial sport. It is designed for sports arenas. I added a wet edge extender and used a sealer to help as water based vanishes dry way to quick. The reason I am trying a new product is that the kitchen floor has worn terribly. In some areas it hasn't survived 10 months and is back to bare timber! I wanted to try something different before giving up on water based finishes on floors. Well so far the finish of the product is fantastic! love it! The wear will be the true test. The product was easy to lay and had a self levelling quality to it making the final finish very smooth.  Fingers crossed..... but if my hands are anything to go by it sticks really well, wont scrub off and isn't effected by water : )

Next will be the pantry... (finally!)








Sunday, January 3, 2016

Christmas and the Kids Cottage

Well not much work on the house has got done these holidays. I felt I wouldn't forgive myself if I didn't build the children the cubby house we have been talking about for years. I aimed to have it done by christmas day and I almost go there. It still needed flashing on the roof and a door. I managed to use about 90% recycled materials from my house which helped reduce the cost. I am eager to insulate and line the interior... but that can wait for now... Merry Christmas and a Happy New Year to everyone. 

















Saturday, January 2, 2016

Hallway


Well the hallway has been a bit of a saga. After installing the plaster board sheets I went to join them and find out that the plasterboard sheets were manufactured with one of there recesses non existent! So I then put in a manufactures claim and 4 or so months later they came and replace them... so four months lost and no advancements made on the hallway. Finally towards the end of 2015 I was able to  get stuck into the joining of the plaster, painting and the roof. Poor Heather and the family had to put up with the scaffold in the hallway for months! Next will be the floor....

you can see the bottom sheet of plaster has only a minimal gap and a hump where the top is as I would expect. 
It meant when I plastered it the tape was exposed at the bottom. 
Re sheeted and roof battened up.